Xin Wei, Shigeru Fujimura: "Multi-update Mode Quantum Evolutionary Algorithm ForCombinatorial Problem", 2010 The 2nd international conference on computer and automatioengineering, pp.281-285, Singapore (2010)
2009年
Wei Weng ,Shigeru Fujimura: "Distributed Intelligence Approaches for Weighted Just-In-Time Production",Transaction On Electrical and Electronic Engineering IEEJ Tans. (2009/10/28 accepted)
Wei Weng ,Shigeru Fujimura: ”Dynamic Scheduling for Multi-Machines with Machine Addition and Removal”International Conference on Intelligent Manufacturing & Logistics Systems IML2009, Kitakyushu, Japan (2009)
Dewei Xing, Shigeru Fujimura: ”Study on A Taboo Search with A New Hybrid Neighborhood Structure for Job Shop Scheduling Problem”International Conference on Intelligent Manufacturing & Logistics Systems IML2009, Kitakyushu, Japan (2009)
Jizen Sou, Shigeru Fujimura: ”A Study on Dynamic Vehicle Routing Problem with Split Delivery”International Conference on Intelligent Manufacturing & Logistics Systems IML2009, Kitakyushu, Japan (2009)
Sicong Tan, Wei Weng, Shigeru Fujimura: ”Scheduling of Worker Allocation in the Manual Labor Environment with Genetic Algorithm”International MultiConference of Engineers and Computer Scientists 2009, Hong Kong (2009)
Kazuhisa Yamada, Shigeru Fujimura: "A STUDY ON RESOURCE LEVELING UNDER UNCERTAIN PROCESSING TIME", 20th International Conference on Production Research (ICPR 20), Shanghai, China (2009)
Zheng Yao, Shigeru Fujimura: "MULTI-PATH TABU SEARCH METHOD FOR JOB SHOP SCHEDULING PROBLEM",20th International Conference on Production Research (ICPR 20), Shanghai, China (2009)
Zheng Yao, Shigeru Fujimura: "SIMULATION MODELING OF AUTOMATED GUIDED VEHICLE SYSTEM BASED ON JIT PHILOSOPHY",20th International Conference on Production Research (ICPR 20), Shanghai, China (2009)
Wei Weng, Shigeru Fujimura: "Multi-Agent Scheduling for Machine Breakdown and Recovery",20th International Conference on Production Research (ICPR 20), Shanghai, China (2009)
Wei Weng, Shigeru Fujimura: "Intelligent Production Control System for Multi-Machines",International Symposium on Scheduling 2009 (ISS 2009), Nagoya, Japan (2009)
Wei Weng, Shigeru Fujimura: "Distributed Feedback Mechanism for Just-In-Time Scheduling Problem",8th IEEE/ACIS International Conference on Computer and Information Science (ICIS 2009), Shanghai, China (2009)
Wei Weng, Shigeru Fujimura: "Online Scheduling of Flexible Flow Shop Manufacturing",2nd International Joint Conference on Computational Sciences and Optimization (CSO 2009), Sanya, Hainan Island, China (2009)
2008年
Wei Weng ,Shigeru Fujimura:“Self Evolution Algorithm to Minimize Earliness and Tardiness Penalties with a Common Due Date on a Single-Machine”Transaction On Electrical and Electronic Engineering (IEEJ Trans 2008, Vol.3)
Wei Weng, Shigeru Fujimura:“Memorial Self Evolution Algorithm to Solve JIT Scheduling Problem on a Machine Unit”6th IEEE International Conference on Industrial Informatics , Daejeon, Korea, (2008)
Wei Weng, Shigeru Fujimura:“Self Evolution Algorithm for Common Due Date Scheduling Problem”6th IEEE International Conference on Automation Science and Engineering , pp.790-795,Washington, D.C. (2008)
Chui-Hui, Shigeru Fujimura:“Evaluation of R-B Advanced Available-to-promise”Asia Conference on Intelligent Manufacturing & Logistics Systems ,pp223-230, Kitakyushu, Japan, February 25-27 (2008)
Zheng Yao, Shigeru Fujimura:“Study On Neighborhood Structures and Tabu Search for Job Shop Scheduling”Asia Conference on Intelligent Manufacturing & Logistics Systems ,pp231-236, Kitakyushu, Japan, February 25-27 (2008)
2007年
Wu, Chin-Hui, Enrique Valerio, Shigeru Fujimura:“Customer Order Synchronization Framework Using CSCW Principles”The 8th Asia Pacific Industrial Engineering & Management System and 2007 Chinese Institute of Industrial Engineers Conference , Kaohsiung Taiwan, December 9-12 (2007)
Jung, ruei-bin1, Shigeru Fujimura:“Project Management for Effective Use of Slack Time”The 8th Asia Pacific Industrial Engineering & Management System and 2007 Chinese Institute of Industrial Engineers Conference , Kaohsiung Taiwan, December 9-12 (2007)
Ping Gu, Yajie Lou, Xuerui Zhang, Shigeru Fujimura:“Dynamic Local Focusing Approach for Production Scheduling Problems”IEEE Conference on Automation Science and Engineering,pp.466-471, Arizona, USA (2007)
Tomoki Shibata, Xuerui Zhang, Xue Hai, Yasuhiro Shimizu, Shigeru Fujimura:“Generalization of Scheduling Information Acquired through User Manipulation for Self-Construction Production Scheduling System”IEEE Conference on Automation Science and Engineering,pp.33-38, Arizona, USA (2007)
Enrique Valerio, Shigeru Fujimura:“Optimal Approach for an Effective Customer Order Synchronization using CSCW Principles”the 19th International Conference on Production Research, Valparaiso, Chile (2007)
Yajie Lou, Xuerui Zhang, Shigeru Fujimura:“A Decomposition Approach for Job Shop Scheduling Problems Focused on The Longest Active Chain”The 19th International Conference on Production Research, Valparaiso, Chile (2007)
Jizen Sou, Hiroshi Katayama, Shigeru Fujimura:“A Study on Dynamic Vehicle Scheduling Problem with Stochastic Demand Environment”The 3rd International Congress on Logistics and SCM Systems (2007)
Ki-Yun Woo,Koichiro Takamasu,Sung-Chul Cho,Shigeru Fujimura:“Reactive Scheduling Algorithm Using Alternative Machines”, International Conference on Electrical Engineering 2007, Hong Kong, China (2007)
Ki-Yun Woo,Koichiro Takamasu,Sung-Chul Cho,Shigeru Fujimura:“Reactive Optimum Scheduling Function using Alternative Machine”, International Conference on Intelligent Manufacturing & Logistics Systems,pp.43-45 (2007)
Koichiro Takamasu,Sung-Chul Cho,Ki-Yun Woo,Shigeru Fujimura:“Scheduling Adjustment Function for Autonomous Distributed Production System”, International Conference on Intelligent Manufacturing & Logistics Systems,pp.368-373 (2007)
Sung-Chul Cho,Koichiro Takamasu,Ki-Yun Woo,Shigeru Fujimura:“Autonomous Distributed Scheduling Adjustment Function considering Set- Up Times with Optimum Moving Method”International Conference on Intelligent Manufacturing & Logistics Systems, IML 2007,pp.374-381(2007)
Yajie Lou,Xuerui Zhang,Shigeru Fujimura:“A Decomposition Scheduling Approach focused on the Longest Active Chaind”, International Conference on Intelligent Manufacturing & Logistics Systems, pp.138-143(2007)
XueRui Zhang,Hai Xue,Yasuhiro Shimizu,Shigeru Fujimura:“Self-construction Production Scheduling System”IEEE Conference on Automation Science and Engineering,pp.531-535, Shanghai, China(2006)
Sung-chul Cho,Ki-yun Woo,Koichiro Takamasu,Shigeru Fujimura:“Autonomous Distributed Scheduling Adjustment Function with Interchanging Operations”IEEE Conference on Automation Science and Engineering, Shanghai,pp.397-402, China(2006)
Shigeru Fujimura,Junsuke Shigechi:“SCM Construction Model with providing Production Capability”International Conference on Logistics and Supply Chain Management 2006, Hong Kong, China
Danxia Zhang,Yajie Lou,Shigeru Fujimura:“An Efficient Approach for Negotiation Using Due Date in a Supply Chain Network”International Conference on Electrical Engineering 2006, YongPyong Resort, Korea
Hai Xue,XueRui Zhang,Yasuhiro Shimizu, Shigeru Fujimura:“Master Information Extraction Mechanism for Production Scheduling System”International Conference on Electrical Engineering 2006, YongPyong Resort, Korea
Koichiro Takamasu,Ki-yun Woo,Sung-chul Cho,Shigeru Fujimura:“Autonomous Distributed Scheduling Adjustment Function”International Conference on Electrical Engineering 2006, YongPyong Resort, Korea
Shigeru Fujimura,Kiyun Woo:“Gantt Chart Interface System for Production Scheduling Work”The 18th International Conference on Production Research, Salerno, Italy
Kiyun Woo,Soonyoung Park,Shigeru Fujimura:“The Real-Time Buffer Management for DBR Scheduling”The 18th International Conference on Production Research, Salerno, Italy
Sunjue Lee,Shigeru Fujimura:“The Study on Evaluation of Adaptive interface by applying static, adaptive, and adaptable menus into context-aware device”
Haipeng Zhang,Mitsuo Gen,Shigeru Fujimura,Kwan Woo Kim:“Ant Colony Optimization Approach for Job-shop Scheduling Problem”Proceedings of the Third International Conference on Information and Management Sciences, Dunhuang, China,pp.426-431(2004)
Haipeng Zhang,Mitsuo Gen,Shigeru Fujimura:“HYBRIDIZING ANT COLONY OPTIMIZATION WITH DISPATCHING HEURISTICS FOR JOB-SHOP SCHEDULING PROBLEM”Proceedings of the fifth Asia Pacific Industrial Engineering and Management Systems Conference 2004,pp.27.6.1-27.6.9(2004)
Haipeng Zhang,Mitsuo Gen,Shigeru Fujimura,Kwan Woo Kim:“Hybrid Ant Colony Optimization Approach for Job-shop Scheduling Problem”20th Fuzzy System Symposium,pp.304-305(2004)
Haipeng Zhang,Dingwei Wang,Jun Gong,Shigeru Fujimura,Mitsuo Gen:“Design for Inventory Management and Production Planning in ERP System”2003 Asia Pacific Symposium on Intelligent and Evolutionary Systems,pp.256-262(2003)