PUBLICATIONS of fujimura-lab

2010年
Xin Wei, Shigeru Fujimura: "Multi-update Mode Quantum Evolutionary Algorithm ForCombinatorial Problem", 2010 The 2nd international conference on computer and automatioengineering, pp.281-285, Singapore (2010)
2009年
Wei Weng ,Shigeru Fujimura: "Distributed Intelligence Approaches for Weighted Just-In-Time Production",Transaction On Electrical and Electronic Engineering IEEJ Tans. (2009/10/28 accepted)
Wei Weng ,Shigeru Fujimura: ”Dynamic Scheduling for Multi-Machines with Machine Addition and Removal”International Conference on Intelligent Manufacturing & Logistics Systems IML2009, Kitakyushu, Japan (2009)
Dewei Xing, Shigeru Fujimura: ”Study on A Taboo Search with A New Hybrid Neighborhood Structure for Job Shop Scheduling Problem”International Conference on Intelligent Manufacturing & Logistics Systems IML2009, Kitakyushu, Japan (2009)
Jizen Sou, Shigeru Fujimura: ”A Study on Dynamic Vehicle Routing Problem with Split Delivery”International Conference on Intelligent Manufacturing & Logistics Systems IML2009, Kitakyushu, Japan (2009)
Sicong Tan, Wei Weng, Shigeru Fujimura: ”Scheduling of Worker Allocation in the Manual Labor Environment with Genetic Algorithm”International MultiConference of Engineers and Computer Scientists 2009, Hong Kong (2009)
Kazuhisa Yamada, Shigeru Fujimura: "A STUDY ON RESOURCE LEVELING UNDER UNCERTAIN PROCESSING TIME", 20th International Conference on Production Research (ICPR 20), Shanghai, China (2009)
Zheng Yao, Shigeru Fujimura: "MULTI-PATH TABU SEARCH METHOD FOR JOB SHOP SCHEDULING PROBLEM",20th International Conference on Production Research (ICPR 20), Shanghai, China (2009)
Zheng Yao, Shigeru Fujimura: "SIMULATION MODELING OF AUTOMATED GUIDED VEHICLE SYSTEM BASED ON JIT PHILOSOPHY",20th International Conference on Production Research (ICPR 20), Shanghai, China (2009)
Wei Weng, Shigeru Fujimura: "Multi-Agent Scheduling for Machine Breakdown and Recovery",20th International Conference on Production Research (ICPR 20), Shanghai, China (2009)
Wei Weng, Shigeru Fujimura: "Intelligent Production Control System for Multi-Machines",International Symposium on Scheduling 2009 (ISS 2009), Nagoya, Japan (2009)
Wei Weng, Shigeru Fujimura: "Distributed Feedback Mechanism for Just-In-Time Scheduling Problem",8th IEEE/ACIS International Conference on Computer and Information Science (ICIS 2009), Shanghai, China (2009)
Wei Weng, Shigeru Fujimura: "Online Scheduling of Flexible Flow Shop Manufacturing",2nd International Joint Conference on Computational Sciences and Optimization (CSO 2009), Sanya, Hainan Island, China (2009)
2008年
Wei Weng ,Shigeru Fujimura:“Self Evolution Algorithm to Minimize Earliness and Tardiness Penalties with a Common Due Date on a Single-Machine”Transaction On Electrical and Electronic Engineering (IEEJ Trans 2008, Vol.3)
薛 海,張 学睿,清水 康弘,藤村 茂:“自己構築型生産スケジューリングシステムの構想”電気学会論文誌C(電子・情報・システム部門誌), Vol. 128, No. 4, pp.646-655 (2008)
Wei Weng, Shigeru Fujimura:“Memorial Self Evolution Algorithm to Solve JIT Scheduling Problem on a Machine Unit”6th IEEE International Conference on Industrial Informatics , Daejeon, Korea, (2008)
Wei Weng, Shigeru Fujimura:“Self Evolution Algorithm for Common Due Date Scheduling Problem”6th IEEE International Conference on Automation Science and Engineering , pp.790-795,Washington, D.C. (2008)
Chui-Hui, Shigeru Fujimura:“Evaluation of R-B Advanced Available-to-promise”Asia Conference on Intelligent Manufacturing & Logistics Systems ,pp223-230, Kitakyushu, Japan, February 25-27 (2008)
Zheng Yao, Shigeru Fujimura:“Study On Neighborhood Structures and Tabu Search for Job Shop Scheduling”Asia Conference on Intelligent Manufacturing & Logistics Systems ,pp231-236, Kitakyushu, Japan, February 25-27 (2008)
2007年
Wu, Chin-Hui, Enrique Valerio, Shigeru Fujimura:“Customer Order Synchronization Framework Using CSCW Principles”The 8th Asia Pacific Industrial Engineering & Management System and 2007 Chinese Institute of Industrial Engineers Conference , Kaohsiung Taiwan, December 9-12 (2007)
Jung, ruei-bin1, Shigeru Fujimura:“Project Management for Effective Use of Slack Time”The 8th Asia Pacific Industrial Engineering & Management System and 2007 Chinese Institute of Industrial Engineers Conference , Kaohsiung Taiwan, December 9-12 (2007)
朴 淳英, 禹 棋允, 藤村 茂:“DBRスケジューリングにおけるバッファサイズ決定手法”電気学会論文誌C(電子・情報・システム部門誌), Vol. 127, No. 3, pp.416-424 (2007)
Ping Gu, Yajie Lou, Xuerui Zhang, Shigeru Fujimura:“Dynamic Local Focusing Approach for Production Scheduling Problems”IEEE Conference on Automation Science and Engineering,pp.466-471, Arizona, USA (2007)
Tomoki Shibata, Xuerui Zhang, Xue Hai, Yasuhiro Shimizu, Shigeru Fujimura:“Generalization of Scheduling Information Acquired through User Manipulation for Self-Construction Production Scheduling System”IEEE Conference on Automation Science and Engineering,pp.33-38, Arizona, USA (2007)
Enrique Valerio, Shigeru Fujimura:“Optimal Approach for an Effective Customer Order Synchronization using CSCW Principles”the 19th International Conference on Production Research, Valparaiso, Chile (2007)
Yajie Lou, Xuerui Zhang, Shigeru Fujimura:“A Decomposition Approach for Job Shop Scheduling Problems Focused on The Longest Active Chain”The 19th International Conference on Production Research, Valparaiso, Chile (2007)
Jizen Sou, Hiroshi Katayama, Shigeru Fujimura:“A Study on Dynamic Vehicle Scheduling Problem with Stochastic Demand Environment”The 3rd International Congress on Logistics and SCM Systems (2007)
Ki-Yun Woo,Koichiro Takamasu,Sung-Chul Cho,Shigeru Fujimura:“Reactive Scheduling Algorithm Using Alternative Machines”, International Conference on Electrical Engineering 2007, Hong Kong, China (2007)
Ki-Yun Woo,Koichiro Takamasu,Sung-Chul Cho,Shigeru Fujimura:“Reactive Optimum Scheduling Function using Alternative Machine”, International Conference on Intelligent Manufacturing & Logistics Systems,pp.43-45 (2007)
Koichiro Takamasu,Sung-Chul Cho,Ki-Yun Woo,Shigeru Fujimura:“Scheduling Adjustment Function for Autonomous Distributed Production System”, International Conference on Intelligent Manufacturing & Logistics Systems,pp.368-373 (2007)
Sung-Chul Cho,Koichiro Takamasu,Ki-Yun Woo,Shigeru Fujimura:“Autonomous Distributed Scheduling Adjustment Function considering Set- Up Times with Optimum Moving Method”International Conference on Intelligent Manufacturing & Logistics Systems, IML 2007,pp.374-381(2007)
Yajie Lou,Xuerui Zhang,Shigeru Fujimura:“A Decomposition Scheduling Approach focused on the Longest Active Chaind”, International Conference on Intelligent Manufacturing & Logistics Systems, pp.138-143(2007)
禹 棋允,藤村 茂:“代替機械を利用したスケジュール調整手法の実現”平成19年電気学会 電子・情報・システム部門大会 講演論文集 pp.524-529(2007)
石橋 浩二,藤村 茂:“ベイジアンネットワークを用いた生産スケジュールの評価手法”平成19年電気学会 電子・情報・システム部門大会 講演論文集 pp.537-540(2007)
村山 隆志,キム ヒョンスン,藤村 茂:“混合品種組立ラインにおけるユーティリティ作業時間を考慮した製品投入順序決定手法”平成19年電気学会 電子・情報・システム部門大会 講演論文集 pp.1092-1097(2007)
Ping Gu, Yajie Lou, Xuerui Zhang, Shigeru Fujimura:“Dynamic Local Focusing Approach for Job Shop Scheduling Problems”平成19年電気学会 電子・情報・システム部門大会 講演論文集 pp.1098-1102(2007)
柴田 知樹,張 学睿,藤村 茂:“自己構築型生産スケジューリングシステム実現に向けたユーザ操作から抽出されたスケジューリング情報の汎用化”平成19年電気学会 電子・情報・システム部門大会 講演論文集 pp.1109-1114(2007)
山下 順也,藤村 茂:“マルチエージェントを用いた高速道路料金所の車両挙動シミュレータの開発”平成19年電気学会 電子・情報・システム部門大会 講演論文集 pp.1024-1030(2007)
2006年
XueRui Zhang,Hai Xue,Yasuhiro Shimizu,Shigeru Fujimura:“Self-construction Production Scheduling System”IEEE Conference on Automation Science and Engineering,pp.531-535, Shanghai, China(2006)
Sung-chul Cho,Ki-yun Woo,Koichiro Takamasu,Shigeru Fujimura:“Autonomous Distributed Scheduling Adjustment Function with Interchanging Operations”IEEE Conference on Automation Science and Engineering, Shanghai,pp.397-402, China(2006)
Shigeru Fujimura,Junsuke Shigechi:“SCM Construction Model with providing Production Capability”International Conference on Logistics and Supply Chain Management 2006, Hong Kong, China
Danxia Zhang,Yajie Lou,Shigeru Fujimura:“An Efficient Approach for Negotiation Using Due Date in a Supply Chain Network”International Conference on Electrical Engineering 2006, YongPyong Resort, Korea
Hai Xue,XueRui Zhang,Yasuhiro Shimizu, Shigeru Fujimura:“Master Information Extraction Mechanism for Production Scheduling System”International Conference on Electrical Engineering 2006, YongPyong Resort, Korea
Koichiro Takamasu,Ki-yun Woo,Sung-chul Cho,Shigeru Fujimura:“Autonomous Distributed Scheduling Adjustment Function”International Conference on Electrical Engineering 2006, YongPyong Resort, Korea
禹 棋允,高増 弘一郎,趙 性,藤村 茂:“代替機械を利用したスケジュール調整処理手順”平成18年電気学会 電子・情報・システム部門大会  講演論文集 pp.978-980(2006)
高増 弘一郎,禹 棋允,趙 性,藤村 茂:“作業投入順序入替による自律分散スケジュール調整機能”平成18年電気学会 電子・情報・システム部門大会  講演論文集 pp.981-986(2006)
2005年
Shigeru Fujimura,Kiyun Woo:“Gantt Chart Interface System for Production Scheduling Work”The 18th International Conference on Production Research, Salerno, Italy
Kiyun Woo,Soonyoung Park,Shigeru Fujimura:“The Real-Time Buffer Management for DBR Scheduling”The 18th International Conference on Production Research, Salerno, Italy
Sunjue Lee,Shigeru Fujimura:“The Study on Evaluation of Adaptive interface by applying static, adaptive, and adaptable menus into context-aware device”
平成17年電気学会 電子・情報・システム部門大会  講演論文集 pp.609-610(2005)
禹 棋允,朴 淳英,藤村 茂:“リアルタイムバッファ管理方式のシミュレーションによる評価”平成17年電気学会 電子・情報・システム部門大会  講演論文集 pp.611-614(2005)
清水 康弘,藤村 茂:“生産スケジューリング業務のためのガントチャートインタフェースシステム”平成17年電気学会 電子・情報・システム部門大会  講演論文集 pp.615-616(2005)
朴 淳英,文 全一,禹 棋允,藤村 茂:“DBRスケジューリングにおける動的バッファサイズ決定モデル”平成17年電気学会 電子・情報・システム部門大会  講演論文集 pp.617-622(2005)
禹 棋允,藤村 茂:“DBRスケジューリングにおけるアラーム抑制機能”平成17年電気学会全国大会  講演論文集 pp.393-394(2005)
張 璟璟,藤村 茂:“反復型ソフトウェア開発におけるスケジューリング手法”平成17年電気学会全国大会  講演論文集 pp.171-172(2005)
藤村 茂,禹 棋允:“生産スケジューリング業務のためのガントチャートインタフェースシステム”情報処理学会第67回全国大会  講演論文集 pp.607-610(2005)
2004年
Haipeng Zhang,Mitsuo Gen,Shigeru Fujimura,Kwan Woo Kim:“Ant Colony Optimization Approach for Job-shop Scheduling Problem”Proceedings of the Third International Conference on Information and Management Sciences, Dunhuang, China,pp.426-431(2004)
Haipeng Zhang,Mitsuo Gen,Shigeru Fujimura:“HYBRIDIZING ANT COLONY OPTIMIZATION WITH DISPATCHING HEURISTICS FOR JOB-SHOP SCHEDULING PROBLEM”Proceedings of the fifth Asia Pacific Industrial Engineering and Management Systems Conference 2004,pp.27.6.1-27.6.9(2004)
Haipeng Zhang,Mitsuo Gen,Shigeru Fujimura,Kwan Woo Kim:“Hybrid Ant Colony Optimization Approach for Job-shop Scheduling Problem”20th Fuzzy System Symposium,pp.304-305(2004)
朴 淳英,禹 棋允,藤村 茂:“DBRスケジューリングにおけるバッファサイズ自動決定手法”平成16年電気学会 電子・情報・システム部門大会  講演論文集 pp.583-586(2004)
禹 棋允,朴 淳英,藤村 茂:“DBRスケジューリングにおけるリアルタイムバッファ管理方式”平成16年電気学会 電子・情報・システム部門大会  講演論文集 pp.587-590(2004)
茂地 純資,藤村 茂:“リアルタイム納期回答による企業間SCM実現方式”平成16年電気学会 電子・情報・システム部門大会  講演論文集 pp.591-594(2004)
張 璟璟,禹 棋允,藤村 茂:“アジャイルソフトウェア開発プロジェクトスケジュール管理手法”平成16年電気学会 電子・情報・システム部門大会  講演論文集 pp.595-598(2004)
2003年
Haipeng Zhang,Dingwei Wang,Jun Gong,Shigeru Fujimura,Mitsuo Gen:“Design for Inventory Management and Production Planning in ERP System”2003 Asia Pacific Symposium on Intelligent and Evolutionary Systems,pp.256-262(2003)
藤村 茂:“情報系における生産スケジューリングシステム構築の課題”平成15年度日本設備管理学会秋季研究発表大会  講演論文集 pp.111-112(2003)